Audio By Carbonatix
Morocco's King Mohammed VI on Wednesday inaugurated several major railway projects in the Hay Hassani district of Casablanca.
The projects, valued at about $1.94 billion, are designed to transform mobility across the Casablanca metropolitan area.
These flagship projects are part of a wider program with a total budget of $9.3 billion, aimed at supporting the steady development of the railway sector.
The program follows the April launch of the Kenitra–Marrakech High-Speed Rail Line (430 km).
It seeks to improve regional connections between Kenitra and Casablanca, enhance urban mobility in Casablanca, Rabat, and Marrakech, and foster a new national railway industry ecosystem.
The projects are financed 70% by the National Railways Office and 30% by the region.
They include the construction of three major new-generation stations, 10 new metropolitan train stations, upgrades to five existing stations, 260 km of new railway lines, 50 civil engineering structures, two technical centres (Zenata and Nouaceur), five maintenance workshops, and the acquisition of 48 new trains.
One of the highlights is the Casablanca-South Station, launched on Wednesday with an investment of about $68 million.
The facility will handle up to 12 million passengers annually and feature 6 platforms, 10 tracks, an outdoor space of 20,000 m², and parking for 700 vehicles.
It will connect with trams, buses, taxis, and high-speed trains, positioning it as a strategic transport hub.
The second new-generation station will serve the Hassan II Grand Stadium in Benslimane, with an investment of about $44 million and an annual passenger capacity of 12 million.
A third station at Mohammed V International Airport will cost $29 million and accommodate 5 million passengers a year. All three will be completed within 24 months.
For commuter services, 10 new metropolitan stations will be built within 20 months at a cost of about $61 million.
They include Mohammedia-Faculties, Zenata, Sidi Bernoussi, Ain Sbâa, Hay Mohammadi, Ville Nouvelle, Mers Sultan, Oasis, Sidi Maârouf, and Nouaceur. Once operational, the commuter network will move about 150,000 passengers daily across three lines totalling 92 km.
To expand capacity, 48 new railcars with seating for 1,000 passengers each will be purchased at a cost of about $680 million.
South Korean manufacturer Hyundai Rotem, selected to supply the trains, will also establish a factory in Morocco to support the country’s rail ecosystem and boost export potential.
Overall, these integrated projects are expected to generate major socio-economic benefits, create jobs, improve safety, protect the environment, and enhance the quality of life for citizens.
Latest Stories
-
President Mahama is not sincere with Ghanaians on LGBTQ bill matter – Hassan Tampuli
8 minutes -
Gov’t to establish Prison Industrial Hub to equip inmates with income-generating skills – Prison Service boss
27 minutes -
Alhassan Tampuli donates cement, roofing sheets to support storm victims in Gushegu
28 minutes -
Alhassan Tampuli appeals for urgent support for storm victims in Gushegu
30 minutes -
The hypocrisy must stop; pass Anti-LGBTQ+ Bill now – Alhassan Tampuli to Mahama
34 minutes -
Imprisonment should be rehabilitative, not punitive – Ghana Prisons boss at UNGA
56 minutes -
Ga Adangbe traditional priests petition Mahama over McDan aviation licence revocation
1 hour -
Anti-LGBTQ Bill: NDC’s arrogance is worrying – Hassan Tampuli
1 hour -
Let’s give OSP time to mature, not to scrap it – Hassan Tampuli
1 hour -
Nigeria convicts 386 Islamist militants in mass trials
1 hour -
Djibouti president wins election with 97.8% of vote, state media says
2 hours -
We don’t have mandate to deduct tax from rent allowance of security services personnel – Interior Ministry clarifies
2 hours -
Ablakwa receives Presidential Special Envoy on Reparations to advance global agenda
2 hours -
Christina Koch becomes first woman to travel around the moon on Artemis II
2 hours -
Epstein survivors’ calls to meet King Charles and Queen harder to ignore as US visit approaches
2 hours